Remodel kitchen

Remodeling a kitchen is one of the most rewarding home improvement projects, but it also requires careful planning. If you’ve been wondering how long the process takes or what to expect along the way, you’re in the right place. 

In this guide, we’ll break down the typical kitchen remodel timeline, highlight key phases, and explain how we streamline the process and make your remodel as stress-free as possible.

Understanding the Timeline for Kitchen Remodeling

The time it takes to remodel a kitchen depends on a few things: the size of the project, the materials you pick, and how customized your design is. Here’s a simple breakdown of the main stages and how long they usually take:

1. Planning Stage (2-3 Months)

This phase sets the foundation for a successful remodel. It involves meeting with designers, discussing your vision, finalizing your budget, and selecting materials. 

At Firenza Stone, our in-house design team and detailed 3D renderings make the process seamless, allowing you to see your dream kitchen come to life before construction even starts.

Key Steps in This Phase:

  • Consultation and design discussions.
  • Material selection from our 30,000-square-foot slab gallery and 10,000-square-foot showroom.
  • Obtaining necessary permits, if required.

2. Demolition Stage (1-2 Weeks)

Once your plan is finalized, the old kitchen needs to be removed to make way for the new design. Demolition might sound daunting, but it’s a relatively quick process when done by professionals.

What Happens Here:

  • Removal of cabinets, countertops, appliances, and flooring.
  • Preparing the space for new installations.

Firenza Stone ensures the demolition is handled efficiently, with minimal disruption to your home.

3. Rough-In Stage (1-2 Weeks)

This is where the “bones” of your new kitchen are addressed. Plumbing, electrical work, and HVAC systems are installed or adjusted to support the new design.

Key Focus Areas:

  • Plumbing lines for sinks, dishwashers, and refrigerators.
  • Electrical work for lighting, outlets, and appliances.
  • HVAC adjustments, if needed, for improved ventilation.

At Firenza Stone, we coordinate with trusted professionals to ensure everything is installed correctly and on schedule.

4. Inspection Stage (1-2 Days)

Inspections are crucial to ensure that all the structural, plumbing, and electrical work meets local codes. This step is typically quick but must be completed before proceeding.

How Firenza Stone Helps:
We manage all the paperwork and inspections, so you don’t have to worry about meeting compliance standards.

5. Finishing Stage (2-3 Months)

This is the most exciting phase, where your new kitchen truly comes to life. It involves installing the cabinets, countertops, backsplash, flooring, and appliances.

What Happens in This Phase:

  • Cabinets are installed first to set the framework for the kitchen.
  • Countertops are measured and fabricated with precision in our state-of-the-art CNC facility.
  • Flooring, backsplashes, and finishing touches like paint and trim are added.

Firenza Stone’s in-house fabrication ensures faster turnarounds and flawless installation, bringing your project closer to completion with exceptional quality.

Minor Updates vs. Full Remodels

The scope of your remodel can significantly impact the timeline.

  • Minor Upgrades (4-6 Weeks): The process is much faster if you’re updating countertops, cabinets, or flooring without major structural changes. Firenza Stone’s ready-to-assemble cabinets and in-stock materials can further streamline this process.
  • Full Remodels (3-6 Months): A complete overhaul involving layout changes, plumbing, and custom designs takes longer but delivers a fully transformed kitchen tailored to your lifestyle.

What Can Cause Delays?

Even with the best planning, challenges can arise. Here are a few common ones—and how Firenza Stone works to prevent them:

  1. Material Delays: Custom or imported materials can take longer to arrive. We minimize this risk with our extensive inventory by offering a wide range of in-stock options.
  2. Unforeseen Issues: Hidden problems like outdated wiring or plumbing can add time. Our experienced team anticipates these challenges during the planning phase, reducing surprises.
  3. Permit Approvals: Permits can take time to process, depending on your location. Firenza Stone handles all the paperwork to keep the project on track.

How Firenza Stone Keeps Timelines on Track

When you choose Firenza Stone, you’re partnering with a team that values your time as much as you do. Here’s how we make the process efficient:

  • In-House Fabrication: By fabricating countertops and other materials in our own facility, we eliminate reliance on third-party suppliers, ensuring faster delivery and higher quality.
  • Streamlined Communication: From the initial consultation to the final walkthrough, we keep you updated every step of the way. No guessing, no confusion.
  • Expert Coordination: Our team manages everything, from demolition to inspections, so the process runs smoothly without delays.
  • Extensive Inventory: With our vast selection of materials, including natural stone and engineered slabs, we can minimize lead times and avoid waiting on shipments for key components.
  • Custom Design Expertise: Our experienced design team helps you make decisions quickly and confidently, avoiding unnecessary back-and-forth and ensuring every detail is finalized before work begins.
  • Proactive Problem-Solving: Our team takes a proactive approach to ensuring nothing derails your project timeline, from anticipating potential challenges to resolving them promptly.

At Firenza Stone, we don’t just aim to meet deadlines—we strive to exceed your expectations, creating a kitchen you’ll love with efficiency, precision, and care. With us, your remodel is in the best hands.

Take the First Step Toward Your Dream Kitchen

Remodeling your kitchen is a journey, but with the right team, it can be a smooth and exciting one. At Firenza Stone, we combine decades of experience, cutting-edge tools, and unmatched customer care to bring your vision to life—on time and with exceptional quality.

Schedule a consultation today to get started, or visit our showroom to explore the possibilities. Let’s create a kitchen you’ll love for years to come.

Frequently Asked Questions

1. How long does a kitchen remodel take from start to finish?

The timeline can vary, but most remodels take anywhere from 3-6 months, depending on the scope of work. Minor updates can be completed in as little as 4-6 weeks.

2. What if I run into unexpected delays?

Our experienced team is prepared for surprises. We address issues quickly and adjust timelines as needed, always keeping you informed.

3. When should I start planning my remodel?

Ideally, start planning 2-3 months before you want the work to begin. This gives time for design, material selection, and permits.

Stay in the know

Sign up for our newsletter to receive updates on new arrivals, promotions and other insights.


By submitting this form, you are consenting to receive marketing emails from: . You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email. Emails are serviced by Constant Contact
You Might Also Like